B-Permit
Plan Check Manual
Instructions
Table of Contents
CHAPTER 1
Introduction
CHAPTER 2
Grading Plans
CHAPTER 3
Street Plans
CHAPTER 4
Storm Drain Plans
CHAPTER 5
Sewer Plans
CHAPTER 6
Structural Plans
CHAPTER 7
Electronic Plan Checking
CHAPTER 8
Erosion Control Plans
CHAPTER 9
Interim Change Authorization (ICA) Procedures
CHAPTER 10
Non-Standard Design Request
CHAPTER 11
Plan Sheets and Notes
CHAPTER 12
Permits from other Jurisdictions
CHAPTER 13
What the Private Engineer Should Know
CHAPTER 14
14 Plan Submittal and Processing
14.1 Requirements for Bond Estimate
14.2 Title and Assignment of B-Permit Number
14.3 Inputting of the B-Permit Application
14.4 Status Card
14.5 Supplemental Design Deposit
14.6 Plan Submittal for First Check
14.7 Bonds
14.7.1 Bond Reductions
14.8 Procedures for Clearances
14.9 Plan Processing
14.10 Construction Permit Requirements
14.11 Closing the Design Permit (BD)
14.12 Final Inspection
14.13 As-Built Plans
14.14 The Completion Notice
Chapter 14 Exhibits