E 100 |
INTRODUCTION
(Formerly E 000) |
| |
Manual
references and sources of information; Definitions; Abbreviations; Fundamentals of real
property. |
| |
|
E 200 |
STREET
IMPROVEMENT PROJECTS (Formerly E 100) |
| |
Street
classifications; Environmental analysis; Street improvement policies; Financing;
Calculations and problem solutions. |
| |
|
| E 300 |
DESIGN CONTROLS AND
CRITERIA (Formerly E 200 and E 500) |
| |
Traffic data; Design vehicle
physical characteristics and minimum clearances; Speed; Highway capacity; Drainage
controls and criteria; Design policy; Terrain and land development; Notices from other
agencies; Survey Ties |
| |
|
| E
400 |
GEOMETRIC DESIGN ELEMENTS
(Formerly E 300) |
| |
Horizontal
alignment; Vertical alignment; Sight distance; Combination of horizontal and vertical
alignment. |
| |
|
| E
500 |
DESIGN
CRITERIA FOR SPECIAL STREET COMPONENTS AND PROJECTS (Formerly E 600) |
| |
Alleys;
Bikeways; Cul-de-sacs and elbow curves; Loading bays; Driveways; Access Ramps; Grade
separations; Intersections at grade; Remodeling improved streets; Realignment and/or
widening of improved streets; Private Streets; Bus Pads; Landscaping. |
| |
|
E 600 |
CROSS
SECTION ELEMENTS (Formerly E 400) |
| |
Streets; Pavements; Curbs; Concrete
gutters; Borders; Medians; Side slopes; Retaining walls and bulkheads; Traffic guide and
barrier installations. |
| |
|
E 700 |
PROJECT
CONSTRUCTION (Formerly E 700) |
| |
Design check prior to advertising
for bids; Design changes prior to contract bids; Bid documents; Changes in plans or
documents after contract is awarded; Final Inspection; Final Plans.
Attachments to E700 |
| |
|
| |
( Former E 800 PROCEDURAL STEPS FOR PROPOSED IMPROVEMENT, will be placed in Manual
"C", Operation and Control) |
| |
Manual
Revision Transmittal |
INDEX |
|